Intermediate Transom
Cuplock scaffold is a tubular system scaffold that uses the cup and blade locking mechanism for a fast, safe.
This consists of a horizontal steel tube with hooks which are designed to fit onto the horizontal standards of the scaffolding system.
The intermediate transom cuplock scaffold is installed between two horizontals at the mid-span of a bay to provide support for the planks in case there is a need to have a void at some point in the bay.
|
Code |
Description |
Material |
Finish |
|
CIT0914 |
Intermediate Transom 3’(914mm) |
48.3mmφ × 3.2mmT, Q235/Q355 |
H.D.G/Powder Coating |
|
CIT1219 |
Intermediate Transom 4’(1219mm) |
48.3mmφ × 3.2mmT, Q235/Q355 |
H.D.G/Powder Coating |
|
CIT2440 |
Intermediate Transom 8’(2440mm) |
48.3mmφ × 3.2mmT, Q235/Q355 |
H.D.G/Powder Coating |
Related products
-
2026 Top 7 Internet Celebrity Container Houses Transforming Modular Living
Contact UsHomestay investor, commercial space designer, creative entrepreneur, cultural and tourism project planner
-
Modular Construction Solutions: Engineering the Future of Rapid-Deployment Infrastructure
Contact UsThe mainstreampreferred products for office, conference, accommodation, and supporting buildings in modern engineering project departments, which combine efficiency, safety, economy, and recyclability
-
Vertical Standard
Contact UsThe Ringlock Scaffold verticals, also known as standards or uprights, are the vertical metal tubes that form the backbone of the RingLock scaffolding system.
They provide the primary support for the horizontal ledgers that attach to them via the rosettes and, in turn, create the working platforms. -
Four-Slope Rapid Assembly Container: Engineering Marvel
Contact UsThe four slope pointed container house is an upgraded modular integrated building that optimizes the roof structure on the basis of traditional flat top container houses.






Reviews
There are no reviews yet.