30 tons/day liquid waste +10 tons/day solid waste hazardous waste incineration device
This project intends to build a 30 tons/day liquid waste +10 tons/day solid waste hazardous waste incineration device for Jining Wansheng Environmental Protection Materials Co., LTD., which is used for incineration and treatment of hazardous waste produced by the factory.
|
No. |
Name |
Capacity |
Thermal transfer value |
|
1 |
Solid |
420kg/h |
3000 ~ 4000Kcal/kg |
|
2 |
Liquid |
1250kg/h |
7000 Kcal/kg |
|
No. |
Item |
Unit |
Specification |
Remark |
|
1 |
Average hourly incineration liquid waste |
Kg |
≥1250 |
|
|
2 |
Average hourly incineration solid waste |
Kg |
≥420 |
|
|
3 |
Rotary kiln outlet temperature |
℃ |
850-900 |
|
|
4 |
Secondary chamber outlet temperature |
℃ |
≥1100 |
|
|
5 |
Secondary chamber smoke residence time |
s |
≥2 |
100% load |
|
6 |
Flue gas carbon monoxide concentration |
mg/m3 |
≤100 |
1-hour mean |
|
≤80 |
24-hour mean |
|||
|
7 |
Incineration efficiency |
% |
≥99.9 |
|
|
8 |
Incineration removal rate |
% |
≥99.99 |
Persistent organic pollutants ≥ 99.9999 |
|
9 |
Thermal reduction rate of incineration residue |
% |
<5 |
100% load |
|
10 |
Daily capacity |
ton |
40 |
|
|
11 |
Annual running time |
day |
≥300 |
|
|
12 |
Oxygen content of flue gas at the the secondary chamber outlet |
% |
6-10 |
Dry flue gas |
|
13 |
Heat conduction oil furnace outlet flue gas temperature |
℃ |
300±25 |
|
|
14 |
Bag inlet and outlet temperature difference |
℃ |
≤10 |
|
|
15 |
Velocity of filtering |
m/min |
0.4-0.6 |
Normal operation |
|
16 |
Annual running time |
h |
≥7200 |
|
|
17 |
Overall engineering system availability |
% |
100 |
|
|
18 |
Range of load variation |
% |
70-110 |
Automatic delivery system——automatic feeding system——rotary kiln (separate kiln tail cover)——secondary chamber——SNCR denitrification system——Waste heat conduction oil boiler——quench deacidification tower——dry spray tower——bag dust collector——induced draft fan——SCR system——spray washing tower——packing tower——Wet electrostatic dust removal——chimney

Related products
-
Waste liquid and waste gas incineration device
Contact UsThe furnace volume of the combined incinerator is based on the exhaust gas generated by incineration, the comprehensive residence time is ≥4s, the high-temperature (1100℃) incineration treatment is ≥1100℃, and the high-temperature section residence time is ≥2.5s to ensure the removal efficiency of organic matter.
-
KSZHDM-03 Combined Grinding Dust Collector
Contact UsFeatures:
● Reasonable structure design facilitates dust settlement
● Convenient dust removal, automatic dust removal to ensure the continuity and efficiency of production
● Low noise and easy to use
● PLC control system control, humanized operation panel design, easy to use
● High filtration accuracy, high efficiency and long service life -
Hazardous waste incineration device project
Contact UsThis project plans to build a treatment of 50,000 tons of organic substance solvents comprehensive recycling and utilization project hazardous waste incineration device, to incinerate the hazardous waste generated by the our factory and for receiving waste from other companies.
-
KSDC-8604A/A1 Centralized Dust Collector
Contact UsFeatures:
● Compact and reasonable structure design
● Convenient dust removal, fully automatic dust removal, to ensure the continuity and efficiency of production
● Dust collection, container loading and unloading is convenient, the connection with the filter funnel is sealed, no dust leakage
● Intelligent control, optional automatic inverter, remote linkage function
● PLC control system control, humanized design of operation panel, easy to use
● The imported high-quality polyester filter material is used, and the surface of the filter material is covered with a high-precision PTFE membrane, which has higher filtration accuracy and higher filtration efficiency